14 June 2026
GIZEWIUSZA - 5U
Location and area:
City: Elk
District: Ełk
Voivodship: Warmian-Masurian Voivodeship
Sub-district and plot number: 307/93 (location on the map in the Geoportal of plot No. 307/93)
Area: 0.2336 ha
Gallery:
Information about the property:
Owner: Municipality of the City of Ełk
Local spatial development plan: local
spatial development plan of the city called "Ełk
– Sikorskiego, Gdańska", approved by Resolution No.
XXXV.347.2021 of the Ełk City Council of October 27
2021
(Journal of Laws of the Republic of Poland). of the Warmian-Masurian Voivodeship of 2022, item 83).
"§ 18. 1. Purpose of areas marked on the plan drawing with symbols 5U (area of 1.0416 ha) and 6U (area of 1.0460 ha): built-up areas (non-burdensome services).
2. Rules development and land development:
1) indicator of the built-up area: from 10% to 40%;
2) indicator building intensity: from 0.1 to 2.0;
3) minimum percentage of biologically active area: 25%;
4) not to be exceeded building lines in accordance with the plan drawing;
5) dimensions Buildings:
a) the height of the buildings - minimum: any, maximum: 16 m; number of storeys up to 4 storeys above ground;
b) height other non-buildings - minimum: any, maximum: 12 m;
(c) allows underground storey.
6) Geometry roofing, materials and colours of roofing, for newly of the designed development:
a) flat or sloping roof slopes from 15° to 45°;
b) roof tiles, metal roofing tile, sheet metal;
c) shades red and gray;
d) for flat roofs are not determined;
7) existing garage and outbuildings can be used in the current way until the land is developed in accordance with the provisions of this plan.
3. Rules protection of the environment, nature and cultural landscape, in accordance with from §5.
4. Rules protection of cultural heritage and monuments as well as cultural goods contemporary, in accordance with §6.
5. Principles shaping communication systems:
1) Availability road to areas 5U and 6U from the internal road marked with the symbol 9KDW;
2) minimum parking requirements, in accordance with §9, sections 3-5.
6. Rules shaping the technical infrastructure, in accordance with §10.
Current use: undeveloped property, overgrown with grass and shrubs, partially hardened with concrete slabs.
Surface and groundwater pollution: no
Have geological surveys of the area been carried out: no
Risk of flooding or landslides: no
Underground obstructions: through the property utilities networks: cnD250 heating pipe with an underground chamber (inactive duct), a duct eSD and eND power supply with lanterns, water supply pipes wo100, woX40niecz. with water supply valve (out of order), duct telecommunications TS with a chamber hatch.
Obstacles on the ground surface: no
Existing ecological constraints: no
Buildings and buildings on the site: no
Transport connections:
Existing infrastructure:
Comments:
Files to download:
- 36765_mpzp_Sikorskiego_2C_Gdanska.pdf (3.94Mb) Download file »
- 36766_ZAL_DO_UCHWALY__ELK_-_sIKORSKIEGO_2C_GDANSKA.PDF (3.35Mb) Download file »
Contact
Urząd Miasta Ełku
ul. Marszałka Józefa Piłsudskiego 4
19-300 Ełk
Godziny pracy
poniedziałek: 8:00-16:00
wtorek-piątek: 7:00-15:30






