Contrast
Font
PL EN DE RU LT UA IT

13 December 2018

The end of the work. Easter

The contract covered the pavement execution exit and sidewalk with paving, concrete edging setting and curbs. Across 10 berths, as well as the vertical and horizontal marking was executed.

The total cost of the work is $122,834.92.